The Cape Cod Rail Trail (CCRT) is an off-road paved bike and pedestrian trail currently spanning between the towns of Yarmouth to Wellfleet, with inter-connecting trails throughout. Through regional efforts, construction is scheduled to begin in 2023 to extend the existing trail within Yarmouth to Mary Dunn Road in Barnstable (Phase 3), and the Town of Barnstable is currently examining route options, continuing the trail through the community from Mary Dunn to the Barnstable/Sandwich town line (Phase 4).
Examining potential routes for an extension of the Cape Cod Rail Trail from the intersection of Mary Dunn Road & Independence Drive to the Barnstable/Sandwich town line, the Town of Barnstable is currently seeking public comments.
December 1, 2020 Public Meeting
To submit your comments on these potential routes, please click here
Scheduled construction to begin in 2023, extending the CCRT through Yarmouth and into a portion of Barnstable, CCRT Phase 3 will follow a combination of an existing and a newly constructed shared-use path from Peter Homer Park to Mary Dunn Road for 4.4 miles, and as shown below.
MassDOT held a virtual public meeting on October 9, 2020 to provide the public with the opportunity to become fully acquainted with the proposed Phase 3 project.
To learn more about Phase 3, please click here.
This project is funded in part by MassTrails, administered by the Department of Conservation and Recreation. |
![]() |